exide charger fault codes
Follow Figure 1 (page 4) for single phase input or Figure 2 and Figure 3 (pages 5-6) for three phase input transformers. (DIM.B) Instr. I8p,d YV``f[$ ?gId 6p$omKt88lL%_n]ijVU@baWC k,Plln8% 0 C >kEG6P@YX+>1312a4i+S K)*rb_>6g!Y1;gD&/N#*Nh3(.aQFQ 1 Having trouble using the Discussion Forums? Figure 3 (page 6) applies to 12 cell 475, 600, 750, 865 Ah; 18 cell 475, 600, 750, 865, 965, 1050 Ah; and 24 cell 475, 600, 750, 865Ah chargers only. Once finished, refer to Table 2 (pages 9-10) for the correct size of AC input fuses. To restart the charger, plug in the next battery. USE COPPER-CLAD ALUMINUM, ALUMINUM OR COPPER CONDUCTORS ONLY. This change should be done by a qualified electrical contractor. 4.4GNB will only bear costs for freight 12 months from the initial date of shipment on any replacement or repair. Following that, check Table 3 (pages 11-12) for the correct size of AC input fuses. 8.0 CABINET OUTLINE/DIMENSIONS FOR Z MODEL CHARGERS ONLY CABINET A B C D D (Mining) E (Mining) DIM. PAGE 2. temperature range must be maintained between 32F - 95F. Do not disassemble the charger. 7.1 Fault and Display Codes 8. For non Z models contact your local GNB service representative. This change should be done by a qualified electrical contractor. 1-888-563-6300 in the USA . DANGER - Risk of electric shock. The charger should be permanently connected to the mains supply. John Brodie, 65, suffered DRIVERLESS/AUTOMATED MATERIALS HANDLING - April 2023. During year four (4) of the warranty, GNB will only cover parts, no labor or travel will be provided by GNB. The product is installed and operated in accordance with generally accepted industrial standards and in accordance with the printed instructions supplied with the charger. Replacement and exchange parts will be warranted for a period of ninety (90) days. We will report back on the show itself next week, but the most significant news for the European equipment sector has probably been overlooked in the lead-up to the show. Ensure that battery and charger are matched. Proper fuse ratings can be found in Table 2 and Table 3(see pages 9-12) for AC input fuses (F1, F2 in case of a single phase input or F1, F2, F3 in case of a three phase input). Indication FdC and FAULT LED is on. Low temperature treatment of forklift battery, Effect of temperature on electric vehicle battery. PAGE 3. Do not touch un-insulated. 7.2 OPTIONS. The charger should be. h)This charger is factory set to charge flooded lead-acid batteries only. 1. SHOW LESS . "), IMPORTANT OPERATING AND SAFETY INSTRUCTIONS, 9.1 SCRFLX Charger Functional Description, APPENDIX A: SCRFLX BATTERY CHARGERS. 7.2 OPTIONS. Indication Abbreviation Interpretation 1.00 2.00 3.00 4.00 5.00 6.00 8.00 1 hour delay set 2 hour delay set 3 hour delay set 4 hour delay set 5 hour delay set 6 hour delay set 8 hour delay set Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts Delay before charge starts CHP CHamPion Control board is set to 2.55VPC not 2. 9.1.7. Keep in mind if the charger is set for more than 100% of Ah of the charger rating the charging time will increase proportionately (up to 16 hours). A 15.10 22.70 32.10 24.30 24.30 24.30 DIM. IMPROPER GROUNDING CAN RESULT IN THE RISK OF AN ELECTRIC SHOCK AND ELIMINATES CHARGER WARRANTY. If the voltage at any location is incorrect, it can be determined that the transformer is faulty. - C.F. If DC cable lengths are adjusted please contact you local GNB service representative. Options . All SCR100 battery chargers can come with a factory installed fused JIC switch assembly option for extra protection of the operator. The charger will not operate in a reversed polarity condition. - 3.5 5 B 190 86.2 9 12 8 12 4 6 C.F. Click here for more information. Page 5: Charger Features The SCR100 chargers are delivered on skids for easy handling using a fork lift truck. Significant savings can be made on energy and operating costs and in CO 2 output. @Am V*pqA,g MHpMQ 2@$30R=@ S UNC hardware provided in all four corners on top cover, markings on the door label and the unit nameplate must be revised, BATTERY WATERING OPERATION AND END OF CHARGE, Upload manuals that we do not have and get. Step 2: Check if the transformer has output Step 1: Check if the mains power supply has electricity and if the battery is under voltage. Refer to Appendix A (on page 19) for a complete list of codes. When the battery voltage is lower than 20V, you can short the J2 and J3 connecting lines on the charger circuit board. #>U During the initial three (3) years of charger warranty period, GNB will bear all parts and labor costs of such repair or replacement. The polarity of the charger plug must be the same as the battery connector. When changing the taps on the input side between 1) 120, 208, 240 VAC or 2) 208, 240, 480 VAC (single phase input), be sure to change the wires and/or jumpers according to Figure 1 (page 4). Do not expose the charger to rain or snow. Forkliftaction.com accepts no responsibility for forum content and requires forum participants to adhere to the rules. have a minimum clearance overhead of eight, inches (8"), ensuring ventilation is not obstructed at the rear intake. 2. Take it to a qualified GNB service center. 10. WARNING: TO REDUCE THE RISK OF FIRE, INSTALL BATTERY CHARGER ON A FLOOR OF NON-COMBUSTIBLE MATERIAL, SUCH AS. Subscribe Now to access Battery chargers restore the electrical energy used during battery operation back to a full state of charge. Kalmar USA, I have a battery charger that is displaying the above codes. STONE, BRICK, CONCRETE OR METAL. . NOTE: Use only identical replacement fuses obtainable from your GNB service representative. The charger has not sustained any transit damage. (Note: When the main circuit is charging, the circuit board is completely disconnected, the charging process is not controlled, it can only be counted as time charging test, and can not be charged for a long time). Examine the charger thoroughly before using, to make sure that no parts have been loosened or damaged during shipment. 1. 2100 HP. IMPORTANT OPERATING AND SAFETY INSTRUCTIONS, 9.1 SCR100 Charger Functional Description, APPENDIX A: SCR100 BATTERY CHARGERS LIST OF DISPLAY INDICATIONS, APPENDIX B: ELECTRICAL SCHEMATIC DRAWINGS, SCR100 SERIES INDUSTRIAL BATTERY CHARGERS, 1.0 IMPORTANT OPERATING AND SAFETY INSTRUCTIONS. Refer to the Troubleshooting section for more details. The floor mounting must be done with #3/8-16 UNC bolts (steel rack) or #3/8 lag screws and anchors (concrete floor). - C 410 186 47. After electrical connection is completed, the charger is ready for operation. This website is best viewed in Internet Explorer 10 or above. WARNING: THE ABOVE PROCEDURES MUST BE FOLLOWED EXACTLY TO AVOID INJURY OR RISK OF ELECTRIC SHOCK. - B 170 77.1 7 10 6 8 3.5 5 C.F. The SCR100 battery charger has an available watering control and end of charge option, in the form of a relay contact at terminals TB10-1 to TB10-2 (supplied for customer connection). The relay closes thirty minutes after the charger reaches gassing voltage. In the "ON" position, AC power is supplied to the charger but the door cannot be opened. In no event shall the original user be entitled to recover for contingent expenses resulting from but not limited to, telephone calls, telegrams, travel expenses, lodging, duties and taxes, labor, rental or replacement equipment, loss of business or profits or other commercial losses. 7.2.2BATTERY WATERING OPERATION AND END OF CHARGE. The charger is warranted for four (4) years from the date of manufacture as determined by the product serial number, with the following exceptions: 3.1Power transformers, SCR's and silicon diodes are warranted for ten (10) years from the date of manufacture of the charger(s) of which they are a part. Contact us for help. 278 0 obj <> endobj The GNB SCR100 battery chargers are convection cooled, solid state, micro-processor controlled SCR regulated chargers designed to make battery charging simple. The front panel has STOP, =, EDIT and INFO buttons. If the voltage is not under voltage, please open the charger casing in case of power failure, and observe whether the fuse, transformer, circuit board and other components are obviously burnt or damaged. Incorrect re-assembly of the charger may result in an explosion, electric shock or fire. For battery sizes not listed, contact your local GNB service representative. Primary switch contacts, fuses, bulbs, and filters are not warranted unless found to be defective prior to use. 22 May 2020 14:53. GNB will only bear costs for freight 12 months from the initial date of shipment on any replacement or repair. 1. | , Standard drawings, professional and technical teams, Win the witness of thousands of enterprises, How to deep discharge inspection of forklift battery, The main point of adding water to the forklift battery. 4.3GNB and its authorized representatives shall not be liable for direct or indirect, special or consequential damages in excess of such repair or replacement. The charger comes with a fuseblock rated big enough to accommodate the highest possible current and voltage for that particular model. 8.2.2 VOLTS Release the UP or DOWN button to display the voltage per cell as: [ x.xx V]. NOTE: The following applies to three phase chargers only: if the charger indicates FAC or F3 upon startup, it means that there is a low or high AC voltage (+35%) or AC phase missing. g)The charger is NOT for outdoor use. We found new distributors with the help of Forkliftaction, Posted NOTE:These options require different control cards per drawing 4120-65-68650-05 (see Appendix B, pages 2131). With the input supply connected and no battery, the charger will, enter the standby mode. supplied with the battery, prior to charging. In the "OFF" position, the door can be opened but only AC power at the input of the switch is present while everything downstream is dead. 318 0 obj <>stream USE COPPER-CLAD ALUMINUM, ALUMINUM OR COPPER CONDUCTORS ONLY. Do not connect the next battery before you see indication OFF/FCA. Do not expose the charger to rain or snow. When stacking chargers on top of each other, ensure that cabinets are bolted together using properly sized black #1/4-20 UNC hardware provided in all four corners on top cover. any ideas Posted 5 Jan 2011 09:59 Discussion started by dan_selph California, United States Post a Reply Report this post Showing items 1 - 1 of 1 results. The charger can be re-set for anywhere between 65% to 200% of the nameplate Ah rating. Final details will not be available until the legislation is published in the EU Official Journal in July. TABLE OF CONTENTS TITLE PAGE 1.0 IMPORTANT OPERATING AND SAFETY INSTRUCTIONS 2 2.0 INTRODUCTION 3 3.0 RECEIVING CHARGER 3 4.0 LOCATION AND INSTALLATION OF CHARGER 3 4.1 Stacking 3 5.0 AC ELECTRICAL SUPPLY 3 5.1 AC Fuse Mounting 3 5.2 Input Voltage Change 3 5.3 AC Voltage Connections 7 5.4 Ground connection 7 6.0 DC OUTPUT 7 7.0 APPLICATION 8 7.1 Display and Fault Codes 8 7.2 Options 8 TABLE 2 - SINGLE PHASE RATINGS 9 TABLE 3 - THREE PHASE RATINGS 11 8. A JIC type switch can only be factory installed and it is available in a B, C or D size cabinet. Installation must only be carried out by suitably qualified personnel, and in accordance with current local and national wiring, The unit should be positioned using lifting equipment, placed under, Battery leads should not be altered without prior consultation with, The charger should be sited in a cool, dry, well-ventilated location, away from corrosive fumes and humid atmospheres. Examine the charger thoroughly before using, to make sure that no parts have been loosened or damaged during shipment. NOTE: Upon completion and proper verification of the input voltage configuration change, markings on the door label and the unit nameplate must be revised (crossing out factory set markings); re-mark the label with a permanent marker to reflect new input voltage configuration and fuse size. a)Before using the battery charger, read all the instructions in addition to the CAUTION, WARNING, and DANGER markings on the charger, battery and all the associated equipment. IMPROPER GROUNDING CAN RESULT IN THE RISK OF AN ELECTRIC SHOCK. The charger should be located in a clean, cool, normal ambient room temperature (between +45F/7.2C and 90F/32.2C) dry and well ventilated area.
Apartments For Rent In Bristol, Ct With Utilities Included,
Articles E